shirag-c-lalkaka-enterprises
header-icon
Helpline No. + 91-98200 64810
 
     
 
  PRODUCTS RANGE
EV Tubular
EL Tubular Battery
Powersafe EP VRLA Batteries
Powersafe NXT VRLA Batteries
Powersafe XHD VRLA + Tubular Batteries
Powersafe UPST
TBS Cells
Solar PV Application
Solar Tubular
Solatron SGL
Golf Cart Batteries
Inverter Tubular
Traction Batteries
Exide Lite
NDP Tubular Standby Batteries
HDP Tubular Standby Batteries
Plante Standby Batteries
EL + Premium Tubular
Invared
Railway Batteries
  Railway Battery
  Railway Battery Manufacturers and Suppliers
THE ULTIMATE UPS BATTERY
railway-battery

Batteries should be initially charged as follows: The cells should be filled with grade sulphuric acid of appropriate specific gravity to the level of 50mm over separator guard. To measure the correct heigh of electrolyte, use an ebonite or plassic rod and press down the separator guard before reading the level. A stick marked or notched ar 50mm from the bottom is useful. The battery should then be allowed to stand for eight to twelve hours. The level will fall due to absorption after filling in and should be restored by adding more acid of the filling-gravity.

   With rich marketing experience we are recognized as one of the leading manufacturers of railway batteries. We have integrated the railway batteries with the latest technology to match the global standard. The railway batteries that we manufacture are recognized as the ultimate ups battery in the market today.
  read more  
 
 
     
   
 
  Footer Icon Footer Icon Footer Icon